Roadmap

Roadmap

From idea to scaling. Statuses are honest; no percentage is computed — there are no measurable criteria yet.

1. Idea

done
The ecosystem mission, direction boundaries and the long-term Future Civilization concept are defined.
Exit criteria: Principles and boundaries documented; public site published.
Next step: Next step: see tasks and updates.

2. Research

done
Website architecture options analyzed (SSG, SPA, server rendering). Static format selected: minimal load on a 1 vCPU / 1.6 GiB VPS.
Exit criteria: Architecture agreed; server audit completed.
Next step: Formalize publication workflow.

3. Design

active
Industrial Futurism design system, structured project catalog and knowledge base; alpha of the main pages already built.
Exit criteria: All required pages implemented and tested (build, links, 404, responsive).
Next step: Finish testing and set up HTTPS.

4. Prototype

planned
The first public website release deployed on the VPS into a separate release directory with rollback.
Exit criteria: HTTPS verified, HTTP codes correct, backup created.
Next step: After confirmation — content expansion.

5. Testing

planned
Regular checks: HTML validity, broken links, uptime monitors, vulnerabilities.
Exit criteria: Test reports: part of every release documentation.
Next step: —

6. Product

planned
The website and internal services become a stable platform for partners and contributors.
Exit criteria: First partner/contributor feedback recorded.
Next step: —

7. Scaling

planned
Expansion toward engineering directions and the Future City concept.
Exit criteria: Not defined yet; to be agreed with partners.
Next step: —

Status →